Friday, June 11, 2010

The TO DO list

Projects


SEWING

1. Canvas covers for fuel jugs


2. Canvas cover for outboard


3. Proper sun cover for cockpit


4. Redo cushions in the Pullman and starboard settee


5. No-seums screens


6. Canvas covers for fenders


7. Bug Netting for companion way


8. Re-stitch canvas cover for the toe rail and hatches


9. Line Bags for sheet lines


10. Scratch bags for the pots


11. Rail bag for the spinnacker


12.

CARPENTRY

1. Hinge companion way screen


2. Some sort of Spice rack


3. Hand rail down the middle of the companion way


4. Propane locker in port lazerette


5. Backrest for Pullman berth


6. Even the leg board on the Pullman berth


7.

ELECTRICAL

1. Figure out what the switch above the liquor locker is for


2. Move location of VHF in cockpit


3. Short in spreader lights


4. Move the control for the tiller autopilot


5.



PLUMBING

1. Replace faucet in head with foot pump


2. Drain for anchor locker


3. Repair faucet in galley


4. Add saltwater pump in galley


5.

PAINTING/VARNISHING/SANDING

1. Sole needs to be finished


2. V-birth needs a coat of varnish


3. Forward hatch


4. Butterfly hatch


5. Small rubrail around outside topsides


6. Small rubrail in cockpit


7. Paint Lockers and bilges


8. Touch up the joints on the caprail


9.

OTHER

1. Remove navigation pod


2. Cup holders in cockpit


3. Stainless steel rail in aft cockpit


4. Wind geni needs rebuild and new wings


6. Better storage under galley sink


7. Better storage under head sink


8. Move furling lines off the stanchions


9. Surf board Rack


10. Put together a watch bag (fanny pack)


11. Properly pack the ditch bag


12. Make radio log


13. Proper Cruising Log